Phoenix Planned Major Street Restrictions

Theo nguồn tin trên trang của phoenix.gov

uly 11, 2014 Drivers should be aware of the following city of Phoenix roadway restrictions and are encouraged to allow for additional travel time. New Restrictions MCDOWELL ROAD – LOOP 101 TO 99TH AVENUE McDowell Road from Loop 101 to 99th Avenue is scheduled to be restricted from 7 p.m. Monday, July 14, to 5 a.m. Tuesday, July 15. Westbound McDowell Road will be closed at 91st Avenue. Traffic will be detoured to Thomas Road. Westbound to northbound Loop 101 access will be maintained at McDowell Road. Eastbound McDowell Road through traffic will be maintained. Eastbound to northbound Loop 101 access will be maintained. Southbound Loop 101 at the McDowell Road exit will be open. Exiting traffic will only be allowed to turn left onto McDowell Road. Pedestrian, bus stop and business access will be maintained. This is a city of Phoenix Water Services Department sanitary sewer relief project. The closure is required for final asphalt paving. Drivers are encouraged to allow for additional travel time during this period. 33RD AVENUE AND CAMELBACK ROAD INTERSECTION The intersection of 33rd Avenue and Camelback Road is scheduled to be restricted on a 24-hour basis until Friday, Aug. 8. Camelback Road will be restricted to two lanes in each direction with no left turns allowed. Right turns will be maintained in all directions. Bus stop, pedestrian and business access will be maintained at all times. This project is for the installation of a fire line and ADA pedestrian ramps and for the removal and installation of traffic signal foundations and poles. The city of Phoenix Planning and Development Department is providing inspection services for this construction. Drivers are encouraged to allow for additional travel time during this period. 35TH AVENUE AND BETHANY HOME ROAD INTERSECTION The intersection of 35th Avenue and Bethany Home Road is scheduled to be restricted on a 24-hour basis for the weekends of: Saturday, July 12, to Monday, July 14; Saturday, July 19, to Monday, July 21; and Saturday, July 26, to Monday, July 28. Each closure will begin 5 a.m. Saturday and end 6 a.m. Monday. Traffic on 35th Avenue will be restricted to one through lane in each direction with no left turns allowed. Bethany Home Road traffic will be restricted to one through lane in each direction with no left turns allowed. Bus stop, pedestrian and business access will be maintained at all times. This is a city of Phoenix Street Transportation Department capital improvement project to provide a water main replacement and residential water services. Drivers are encouraged to allow for additional travel time during this period. None. Special Events WNBA ALL-STAR FAN FEST – FRIDAY, JULY 18 The Fan Fest will take place on Central Avenue from Jefferson to Washington streets. Central Avenue from Jefferson to Washington streets is scheduled to be closed to stage this event from noon to 11:30 p.m. Friday, July 18. During this event, Central Avenue through traffic will be detoured at Jefferson Street to Second Street. Police officers will be onsite to assist with traffic control. Drivers are highly encouraged to use an alternate route or allow for additional travel time during this period. Reopening After Restrictions None. Continuing Restrictions Bethany Home Road – 31st to 35th avenues, partial restriction due to a city of Phoenix Street Transportation Department capital improvement project to provide a water main replacement and residential water services, with completion scheduled for July. Broadway Road and 16th Street intersection, partial restriction due to a city of Phoenix Water Services Department sewer main improvement, with completion scheduled for July. Broadway Road – 15th to 24th streets, partial restriction due to a city of Phoenix Water Services Department sewer main improvement, with completion scheduled for December. Broadway Road “Avenida Rio Salado” – Central to 15th avenues is partial restriction due to a city of Phoenix Street Transportation Department capital improvement project to provide “connectivity” to the west valley, with completion scheduled for July. During the “Avenida Rio Salado” project, Broadway Road will be restricted between Seventh Street and 51st Avenue. Deer Valley Road and Black Mountain Boulevard intersection, partial restriction due to a city of Phoenix Planning and Development Department road widening and improvements project, with completion scheduled for August. Greenway Parkway between Seventh and 19th avenues, full closure due to the demolition and construction of the Cave Creek Wash Bridge located on Greenway Parkway between 14th Avenue and 17th Drive, with completion scheduled for September. Indian School Road – 10th to 16th streets, partial restriction due to a Southwest Gas Corporation infrastructure improvement project for a new natural gas main, with completion scheduled for August. Indian School Road – 56th to 58th streets, partial restriction due to a Southwest Gas Corporation infrastructure improvement project for repair of a natural gas main, with completion scheduled for July. Jomax Road – Norterra Parkway and 19th Avenue, partial restriction due to a Planning and Development Department project to install an 8-inch sewer line to serve a new development project east of North Valley Parkway and Jomax Road, with completion scheduled for July. Lower Buckeye Road – 43rd to 51st avenues, partial restriction due to a city of Phoenix Street Transportation Department capital improvement project widening Lower Buckeye Road, with completion scheduled for December. Seventh Street – Roosevelt Street to Thomas Road, partial restriction due to an Arizona Public Service infrastructure improvement project, completion scheduled for August. 19th Avenue – Grand Avenue and McDowell Road intersection, partial restriction due to an Arizona Department of Transportation $12.7 million improvement project of US 60 (Grand Avenue). The project will include pavement improvements, road construction, and new right turn lanes and sidewalks at various locations. New lighting, landscape, screen walls, and fencing will be included in the project, with completion scheduled for July. For additional information, email projects@azdot.gov or call the Project Hotline at 855-712-8530. 24th Street – Broadway Road to University Drive, partial restriction due to a city of Phoenix Water Services Department sewer improvement project that requires major storm drain modifications at 24th Street and Jones Avenue, with scheduled completion for July. 35th Avenue – Bethany Home Road to Missouri Avenue, partial restriction due to a city of Phoenix Street Transportation Department capital improvement project to provide water main replacement and residential water services, with completion scheduled for July. 43rd Avenue – Lower Buckeye Road to Buckeye Road, partial restriction due to a city of Phoenix Street Transportation Department capital improvement project widening of Lower Buckeye Road and 43rd Avenue, with completion scheduled for December. 51st Avenue – Southern Avenue to Broadway Road, partial restriction due to the city of Phoenix, Street Transportation Department “Avenida Rio Salado” project, with completion scheduled for July. Northwest light rail extension – Ongoing restrictions along 19th Avenue and cross streets related to light rail northwest extension construction. 19th Avenue between Bethany Home Road to Dunlap Avenue will be reduced to one lane in each direction for utility relocation. More information at valleymetro.org/metro_projects_planning/traffic_restrictions. To receive weekly construction updates via email, please email the Community Outreach Coordinator for Northwest Phoenix, Carla Kahn, ckahn@valleymetro.org. These restrictions represent only the major planned activities reported to the Street Transportation Department’s Right-of-Way Management Office. This listing does not reflect closures or restrictions due to unexpected events such as flooding, traffic collisions, fires, utility failures or other emergencies. For information on continuing planned major street restrictions, visit phoenix.gov/streets or follow @PHXStreetTrans on Twitter. Contact: Matthew Heil Phone Number: 602-261-8254

https://www.phoenix.gov/news/streets/33]]]]> ]]>